Cautions for Maintenance of Stainless Steel Cross
2. When installing, Stainless Steel Cross can be directly installed in the pipeline according to the connection mode, and installed according to the position used. Generally, Stainless Steel Cross can be installed in any position of the pipeline, but Stainless Steel Cross needs to be easy to operate the inspection, pay attention to cut-off Stainless Steel Cross media flow should be upward under the control valve disc, Stainless Steel Cross can only be installed horizontally. When installing Stainless Steel Cross, attention should be paid to the sealing, so as to prevent leakage and affect the normal operation of pipelines.
3. Handwheel is used for ANSI B16.11 Sch40 Forged Stainless Steel Cross. Do not use lever or other tools to avoid damaging valve parts. The handwheel rotates clockwise to close and vice versa to open. The use of Zi Ah should be fair, to ensure the accurate use of methods and means.
4. Bolts of packing gland of Stainless Steel Cross valves should be tightened evenly, and should not be pressed into a crooked state, so as not to obstruct valve stem movement or cause leakage by bruising.
5. Stainless Steel Cross should always be kept clean during use. Driving threads must be lubricated on time. When faults are found, they should be stopped immediately to find out the causes and clear up the faults.
previous_pageSurface Treatment and Packaging of Stainless Steel Elbows
next_pageWhat is the commonly used 304 stainless steel flange standard?