When the composition adjustment is appropriate,Stainless Steel Tees sampling and analysis should be carried out until the specification is carried out. The ingot will be cast out within 1.5 hours after the ingot is removed. After 20-60 hours in the insulation pit, when the temperature is 650-750 degrees Celsius, it should be put into the high temperature furnace for heating. Then, the casting and annealing are carried out. The inspection inspection through after the rough machining, such as Sanitary Stainless Steel Weld Reducing Tee no doubt be tempered, this time has been close to the product scale, in order to prevent deformation, have certain requirements on the tempering temperature, to ensure that the tempering temperature is not too high, even tempered. Then sampling analysis.